Half-Round Gutter Installation
Intermediate Project dependent

Rainwater Systems

Half-Round Gutter Installation

Complete guide to installing fascia-mounted half-round guttering, including bracket spacing, fall calculation, downpipe positioning and joint assembly.

Ogee Gutter Installation
Intermediate Project dependent

Rainwater Systems

Ogee Gutter Installation

Step-by-step fitting of Kalsi Klassic and Krown Ogee guttering, including bracket positioning, gutter fall, movement allowance at union brackets, and outlet installation.

110mm Underground Drainage
Advanced Project dependent

Underground Drainage

110mm Underground Drainage

Laying 110mm drainage pipe, including safe excavation, design gradients, bedding and backfill, access provision, jointing, and pre-backfill testing.

160mm Underground Drainage
Advanced Project dependent

Underground Drainage

160mm Underground Drainage

Installation considerations for 160mm drainage systems, including design approval, safe excavation, jointing, bedding, access, testing, and sewer connections.

Push-Fit Soil Stack Installation
Advanced Project dependent

Soil & Waste

Push-Fit Soil Stack Installation

Installing a push-fit soil stack, including supported pipework, branch connections, ventilation, roof termination, and tested fire-stopping where required.

Solvent Weld Waste System
Intermediate Project dependent

Soil & Waste

Solvent Weld Waste System

Guide to 32mm, 40mm and 50mm solvent-weld waste systems, including appliance-specific layout, joint preparation, the specified cement system, support, and traps.

Fascia & Soffit Replacement
Advanced Project dependent

Roofline

Fascia & Soffit Replacement

Removing old roofline boards and fitting PVC-U fascia and soffit, including structural timber assessment, board support, roof-specific ventilation, and finishing details.

Capping Board Installation
Advanced Project dependent

Roofline

Capping Board Installation

Fitting PVC-U capping board over sound, dry and stable timber using approved mechanical fixings, while preserving eaves support, drainage and ventilation.

Bathroom Wall Panel Installation
Intermediate Project dependent

Wall Panelling

Bathroom Wall Panel Installation

Fitting Kalsi PVC wall panels using the method approved for the exact panel family, substrate, adhesive or clips, trims, and sealed wet-area joints.

Double Embossed External Cladding Installation
Intermediate Project dependent

External Cladding

Double Embossed External Cladding Installation

Installation of DuraKlad Double Embossed external cladding using ventilated timber battens, concealed stainless-steel fixings, expansion gaps and matching trims.

External Shiplap Cladding
Intermediate Project dependent

External Cladding

External Shiplap Cladding

Fitting Kalsi shiplap cladding over a drained and ventilated cavity, including supported battens, starter and edge trims, movement allowance, and opening details.

Woodland Timber Cladding Installation
Intermediate Project dependent

External Cladding

Woodland Timber Cladding Installation

Installing Woodland Timber external cladding over a ventilated batten framework, including concealed mechanical fixings, movement allowance, trims, and colour handling.

MDPE Water Pipe Installation
Advanced Project dependent

MDPE Pipe

MDPE Water Pipe Installation

Installing blue MDPE potable-water service pipe, including notification, trenching, compatible fittings, protection, inspection, and undertaker-specific commissioning.

Installation Best Practices

  • Always read the full installation guide before starting work
  • Check all components and quantities before installation
  • Use only Kalsi-recommended fixings and adhesives
  • Allow for thermal expansion—follow expansion gap guidance
  • Check the current written guarantee terms for the exact product
  • Contact technical support if you're unsure—we're here to help

Technical Support

Got a question during installation? Our technical team can talk you through any issue.

0121 693 0373 Contact Support

Video Tutorials Coming Soon

We're developing video installation guides to complement our written guides. In the meantime, visit our video library for manufacturing and product overview content.